Shed Wall Plans

September 6th, 2020
house, shed
Last week I wrote about estimating whether insulation was worth it for our shed if we're going to use it as a home office. While I'm waiting for the carpenter to put a new roof on it, I'm thinking through what finishing the walls would look like.

The Facebook side of the discussion on the insulation post was very helpful, and got me thinking about putting closed cell foam panels directly against the concrete walls. Because it's both a vapor barrier and efficient insulation it reduces the risk of condensation happening between the concrete and the insulation.

I'm less sure about what comes next. Whatever I'm doing is not structural, and there are a lot of trade-offs. All of the options involve the layer of closed-cell foam directly against the concrete, but then they vary on how they're finished. Standard options:

  • Build a 2x3 wall, then drywall. This gives room to run the electrical, and wood to attach the drywall to. The wall would be attached to the subfloor below and roof joists above. Nothing needs to go through the foam to the concrete, and the wood framing makes later work easier.

  • Build a 2x4 wall. Same advantages as a 2 x 3 wall, but now there's enough space in the cavity that it could be insulated. I could either use this for a larger amount of insulation total, or reduce the thickness of the foam.(video example)

  • Furring strips. Run strips of wood horizontally along the wall, and attach them through the foam into the concrete. Then run a second set vertically, 16 inches on center, to attach the drywall to. There's room for electrical as long as you dig out a bit of the foam for the boxes. (video example).

Less conventional:
  • Verticals inside: Instead of using furring strips, put vertical 2x3s from floor to ceiling, 16 inches on center. Attach them a the top and bottom (roof joists and subfloor). Attach the drywall to the wood. Run the electrical through the ceiling, and then down into the appropriate bay so you don't need to drill through any verticals. Essentially the same as the furring strip solution, but without needing to put fasteners through the foam into the concrete. This seems better than the furring strip approach?

  • Verticals outside: Attach the drywall to the foam with adhesive. Then instead of standard drywall joints, run 2x3s vertically 48 inches on center. Electrical in conduit, attached to the verticals. Mildly funny looking, doesn't feel quite as nice, maximizes space if you ignore the verticals.

foam finish overall R-value cost
1" verticals outside 1.5" R-6.5 $372
2" verticals outside 2.5" R-13 $580
1" verticals inside 3" R-6.5 $468
2" verticals inside 4" R-13 $676
3" verticals inside 5" R-19.5 $988
1" 2x3 4" R-6.5 $536
2" 2x3 5" R-13 $744
1" 2x4 insulated 5" R-21.5 $930
2" 2x4 insulated 6" R-28 $1138

This doesn't include the cost of the fasteners or adhesive, but seems about right. I'm leaning towards the approach of vertical 2x3s sixteen inches on center under the drywall with 2" foam, since it seems to offer a good balance of cost, insulation, and minimizing wasted space.

Referenced in: Backyard Office

Comment via: facebook, lesswrong, substack

Recent posts on blogs I like:

On The Gender Socialization Of Trans People

~~nuance~~

via Thing of Things June 9, 2025

Elixir's Last Dance

On May 18th, the contra dance band Elixir had their last gig ever. The dance was packed: there were three hundred people. It was the only dance BIDA has ever done where they sold tickets. People flew from across the country just to hear Elixir play one la…

via Lily Wise's Blog Posts June 5, 2025

Workshop House case study

Lauren Hoffman interviewed me about Workshop House and wrote this post about a community I’m working on building in DC.

via Home April 30, 2025

more     (via openring)